Translate

Sunday, November 05, 2017

New look for 2018

We are certain membership will be happily impressed and surprised with the below improvements awaiting them next spring.


Furnace No 4
Kitchen No 1
Work has been completed to increase parking facilities and improve the on site roads in September. Interior and exterior renovations were commenced in October and are almost complete in Cabins 1, 2 and 4. A new heating system was installed in cabin 4. A new bedroom ceiling was finally completed along with the front small deck replaced at cabin 2. Members will appreciate the newly renovated and installed kitchen cabinetry, cook stove and reconfigured kitchen in cabin 1. A new (used) wood heating cook stove and propane cook stove was installed in number 1 kitchen. Provision for future solar lighting was also installed with wiring in Cabins 1 and 2. A And finally, several old or original propane lines along with the gaz tanks were replaced and repositioned in cabins 1.
 

No comments: